New main distribution to factory following transformer upgrade for Staples Consumables Ltd

Butlers were asked to design and install new 1,600A distribution system for the entire factory site. This required liaising with the DNO (Distribution Network Operator) and the client to provide a smooth changeover. We provided a bespoke switch gear solution designed and built by our specialist sub-contractor and also designed and installed all the three phase distribution away from the switch room to the factory via a number of sub-mains.